
Can Exhauster
Construction:
- The total length of exhausting chamber will be High.
- Stainless steel top cover & drip tray at bottom with common drain.
- Complete with steam fittings, Temperature gauge etc.
- Water Sealed top covers.
- Stainless steel chain with folded stainless steel slat.
- Fixed speed chain Drive.( Interchangeable by suitable chain wheel)
- Speed to be confirmed by you in P.O.
- Arrangement of perforated pipes for proper distribution of steam.
- Skid plate at ends of conveyor.
- Food grade curtain at entry & exit to avoid leakage of steam.